PM Surya Ghar Rooftop Subsidy Process Explained (2025)

Complete walkthrough of the rooftop solar subsidy process under PM Surya Ghar: registration, vendor selection, installation, inspection, and subsidy disbursal.

The PM Surya Ghar scheme provides central financial assistance for residential rooftop solar systems. The process is transparent and largely online, ensuring timely disbursal after successful installation and inspection.

Step-by-Step Process

  1. Register on the National Portal and select your DISCOM
  2. Get technical feasibility approval
  3. Choose an empanelled vendor and finalize system design
  4. Install the system, complete tests and safety checks
  5. DISCOM inspection and net meter installation
  6. Upload commissioning report and claim subsidy

Typical Timelines & Tips

  • Approvals: 2–4 weeks depending on area and DISCOM workload
  • Installation: 3–5 days for residential systems
  • Disbursal: Generally within 30 days post-commissioning
  • Retain all invoices, test reports, and photographs for verification

We manage portal registration, documentation, technical drawings, and coordination with DISCOM so you can focus on outcomes—reliable savings and clean power.